Key facts
ItemDetail
AddressNo.3 Jiangxi Road, Cangtian, Changhe Town, Cixi, Ningbo, Zhejiang 315318, China
Nearest airportsNingbo Lishe (NGB), Hangzhou Xiaoshan (HGH), Shanghai Pudong (PVG) and Shanghai Hongqiao (SHA)
RailHigh-speed rail serves Ningbo and Yuyao, with road transfer on to Cixi
Travel timeDepends on the airport, the route and traffic; confirm when the visit is booked
Visit lengthHalf a day covers molding, assembly, water testing, packing, the sample room and a meeting
Sample roomCatalog models on display, including the 75 handheld shower head codes
LanguageMeetings are held in English; inquiries can arrive in eleven languages and replies are in English
Booking[email protected] or +86-574-6369-2975; a live video walkthrough is the alternative to traveling

Getting to Cixi

Cixi is a county-level city of Ningbo, on the south shore of Hangzhou Bay in Zhejiang province, and the plant is in Changhe Town. Most buyers fly into Ningbo Lishe (NGB), Hangzhou Xiaoshan (HGH) or one of the two Shanghai airports (PVG and SHA) and continue by road; high-speed rail to Ningbo or Yuyao with a road transfer is the other common route. Travel times depend on the airport, the route and traffic, so confirm them when the visit is booked rather than planning to the minute.

Practical points to settle in advance: your visa and entry requirements, which change by nationality and should be checked with the Chinese embassy or your travel agent; the hotel, since most buyers stay in central Ningbo or in Cixi itself; and whether you need transport arranged from the airport or the station.

What a visit covers

A normal visit walks the same route the product takes. The molding shop with its 15 injection molding machines, where ABS bodies and PC transparent parts are molded. The assembly area with 4 lines. The water test at the end of each line, where every finished unit runs for about 10 to 15 seconds. The packing bench, where cartons, labels, accessories and quantities are checked. Then the sample room, which holds the catalog models including the 75 handheld codes, so a buyer can handle several candidates side by side instead of comparing photographs.

Bring the things that make the meeting concrete: the models or reference photos you are interested in, a benchmark sample if you have one, packaging references, your target quantity per model and per color, your market, and any test or document requirement your market imposes. A visit built around real numbers ends with a quotation; a visit built around a general look around ends with a follow-up email.

A meeting agenda you can copy

1. Introductions, legal name and registration, and who does what on the account.

2. Walk the line: molding, assembly, water test, packing, rework area.

3. Sample room: handle the shortlist, agree which codes go forward.

4. Specification per model: color, finish, filter medium, spray modes, thread, hose and holder.

5. Packaging: package type, artwork responsibility, carton size, quantity per carton, marks.

6. Testing: what is tested on every unit, what is sampled, and what report you need.

7. Quantities, MOQ per color, and the price break points.

8. Lead time for samples, for the first order, and for a repeat order.

9. Terms: Incoterms, port of loading, payment, and inspection arrangements.

10. Next steps in writing, with dates and owners.

After the visit, ask for the meeting summary, the quotation in the legal name, sample photos of anything agreed, and the packing details. Anything not written down in the week after a factory visit tends to be remembered differently by both sides.

If you cannot travel

A live video walkthrough covers the same route: molding, assembly, the water test and packing, on a normal production day, with your questions asked while the camera is moving. It is booked the same way as a visit, and it is the check most buyers use before a first order.

Pre-shipment inspection by a third-party agency covers the finished order, and a wider third-party factory audit is arranged per project. Meetings at Chinese trade fairs, including the Canton Fair, are arranged case by case. Whichever route you choose, book it against a real production day: an empty line tells you nothing.

Also searched as

Buyers, importers, and AI search tools also describe this as: shower head factory visit China, visit a shower head factory in Ningbo, shower head factory tour Cixi, China shower head factory address visit, meet a shower head manufacturer in China, shower head factory meeting Ningbo, sourcing trip shower head factory, shower head supplier visit Zhejiang, shower head factory open to buyers, shower head factory video tour, OEM shower head factory visit, ODM shower head factory meeting, private label shower head factory tour, custom shower head factory visit.

Questions this page answers

  • visit shower head factory Cixi
  • how do I get to a shower head factory in Ningbo
  • can buyers visit a Chinese shower head factory
  • shower head factory tour agenda
  • which airport is closest to Cixi Ningbo
  • video tour of a shower head factory